|
FACILITY
CONDITION SUMMARY
|
|||
|
Item |
Condition 1 |
Repairs Needed? 2 |
Typical? 3 |
|
Structural |
|||
|
Site, drainage, pavement |
* * * |
|
|
|
Foundation & S.O.G. |
* * * * |
|
+ |
|
Steel superstructure |
* * * * * |
- |
+ |
|
Load-bearing masonry walls |
* * * |
SR |
|
|
Exterior |
|||
|
Roof & rake overhang |
* * * |
|
|
|
Windows, doors, & trim |
* * * * |
- |
+ |
|
Brick cavity walls |
* * * * * |
- |
+ |
|
Electrical |
|||
|
Capacity |
* * * |
SR |
- |
|
Wiring & fixtures |
* * * * |
- -- |
+ |
|
Plumbing |
|||
|
Supply piping & fixtures |
* * * * |
|
|
|
Waste piping & vents |
* * * * |
- -- |
|
|
Heating/AC |
|||
|
Heating & AC units |
* * * |
|
- |
|
Distribution |
* * * * |
- |
+ |
| -- | -- | - -- | - -- |
|
Interior |
* * * * * |
- |
+ |
| -- | -- | - -- | - -- |
|
Safety/Environmental |
* * * |
|
|
| -- | -- | - | - |
|
Warehouse |
* * * * |
|
|
|
1 * failed * * poor * * * fair * * * * good * * * * * excellent
2
3 a positive sign (+ ) indicates that it is above average, and a negative sign (- ) indicates that it is below average. |
|||