RETAINING WALLS INVESTIGATION

Photographs

(Click on the hyperlinked photographs to enlarge)

Overall view of pool area. Elevation view of wall #1. Close-up of diagonal crack showing an increase in width from bottom to top of wall.

Photo 1

Photo 2

Photo 3

Diagonal crack at left end of wall #1. Note the same increase in width from bottom to top. Wall #1 footing excavation. Toe width is approximately 8". Elevation view of wall #2 (at pool) and wall #3 (below driveway).

Photo 4

Photo 5

Photo 6

Elevation of wall #3 and concrete wall. Note proximity of parked vehicle to the wall. Approximate location of footing excavation. Wall #3 footing excavation. Re-bar spacing is irregular and is not a part of the stem. End of driveway at top of wall #3.

Photo 7

Photo 8

Photo 9